2012 02 06 - Today, the last lorry took away pieces of the old house`s cellar. A few men marked spots on the ground to mark where there will stand the new house and how far deep the digger should dig. Red lines and dots are to be seen. I can see a pool of water on the west/east side where above once the second living room was. Is it groundwater?
2012 02 08 - Yesterday, a lorry arrived and brought a skip full of little stones and unloaded the pile on a special place there. A man with help of the digger evened the ground with the stones and later in the afternoon a brand new crane arrived and got set up on the stable stony surface. The pool of groundwater turned to a lake.
2012 02 13 - Two men from the building company came to look at the situation. They are ready to start but the weather isn`t yet. The only thing they could see was snow. A lorry came and brought 6 huge pipes and steal grid for the cellar floor. Not only the area got a fence also the crane is now rounded by a steal fence.
---------------
2012 02 24 - The base plate is made and some cellar sides are concreted. The groundwater is pumping into a special pipe under the ground. The cellar is deeper then the old one. A lorry brought a grey cabin for the men to keep them try and warm. Another cabin is brought to hold the tools safe, they do lock it at night.
----
2012 03 09 - The men at the building site there are preparing for the first floor base. There the rooms on the first floor look great with its huge windows. A doppel garage will follow. Here are so many things which are changing. One elderly neighbour passed away recentley. An other neighbour told me he has given his house to his granddauther who will knock it down too. He is already 85 and will get a nice tiny flat in the house. If I am not get mad I can tell you how this all gets on.
2012 02 25 - Yesterday the men set up the last walls and are going to wait until the contrete will arrive - this will happen on Monday. During the night from Saturday to Sunday the whole was filled with groundwater again, the reason is, the pump didn`t work properly.
---------------
2012 02 28 - Now there are all cellar`s walls finisched, but the first floor plate is still missing. Do they set up the inner walls before the plate arrives, who knows. The outsides of the cellar are painted in black, it is a special paint to leave the groundwater outside. I was so angry today, do not like to speak about it. Give someone a finger they will take the whole hand.
2012 02 29 - The outside of the cellar is getting diked with light blue mates. The inner walls are set up. Now the workers are working on the first floor plate, the concrete can then arrive.
-----
2012 04 01 - The roofs are nearly finisched. I say roofs because they are three including the garage. Two men were there yesterday I set up the innerwalls. The place around the front door is a bit strange but let us wait what more they want do. The builders have been working around the house they put some more pipes under the soil.
2012 02 08 - Yesterday, a lorry arrived and brought a skip full of little stones and unloaded the pile on a special place there. A man with help of the digger evened the ground with the stones and later in the afternoon a brand new crane arrived and got set up on the stable stony surface. The pool of groundwater turned to a lake.
2012 02 13 - Two men from the building company came to look at the situation. They are ready to start but the weather isn`t yet. The only thing they could see was snow. A lorry came and brought 6 huge pipes and steal grid for the cellar floor. Not only the area got a fence also the crane is now rounded by a steal fence.
---------------
2012 02 24 - The base plate is made and some cellar sides are concreted. The groundwater is pumping into a special pipe under the ground. The cellar is deeper then the old one. A lorry brought a grey cabin for the men to keep them try and warm. Another cabin is brought to hold the tools safe, they do lock it at night.
----
2012 03 09 - The men at the building site there are preparing for the first floor base. There the rooms on the first floor look great with its huge windows. A doppel garage will follow. Here are so many things which are changing. One elderly neighbour passed away recentley. An other neighbour told me he has given his house to his granddauther who will knock it down too. He is already 85 and will get a nice tiny flat in the house. If I am not get mad I can tell you how this all gets on.
2012 02 25 - Yesterday the men set up the last walls and are going to wait until the contrete will arrive - this will happen on Monday. During the night from Saturday to Sunday the whole was filled with groundwater again, the reason is, the pump didn`t work properly.
---------------
2012 02 28 - Now there are all cellar`s walls finisched, but the first floor plate is still missing. Do they set up the inner walls before the plate arrives, who knows. The outsides of the cellar are painted in black, it is a special paint to leave the groundwater outside. I was so angry today, do not like to speak about it. Give someone a finger they will take the whole hand.
2012 02 29 - The outside of the cellar is getting diked with light blue mates. The inner walls are set up. Now the workers are working on the first floor plate, the concrete can then arrive.
-----
2012 04 01 - The roofs are nearly finisched. I say roofs because they are three including the garage. Two men were there yesterday I set up the innerwalls. The place around the front door is a bit strange but let us wait what more they want do. The builders have been working around the house they put some more pipes under the soil.